Categories | Scaffold Screw Jack |
---|---|
Brand Name: | HORIZON |
Model Number: | scaffold screw jack head |
Certification: | SGS |
Place of Origin: | CHINA |
MOQ: | 2000 pcs |
Price: | pls ask HORIZON |
Payment Terms: | L/C, T/T |
Supply Ability: | 20000 pcs per week |
Delivery Time: | 15-25 days |
Packaging Details: | pallets, bundles, bulk |
Material: | Q235 steel pipe |
OEM: | Available |
finishing: | zinc-plate, hdg, painted |
Standard: | BS1139 |
Size: | dia38mm x 5mm, or tailor made |
Application: | scaffolding height adjustament |
Base plate: | 150 x 120 x 50 x 6mm |
Casting nut: | 0.5kg |
Company Info. |
HORIZON FORMWORK CO., LTD. |
View Contact Details |
Product List |
Adjustable Scaffold Screw Jack Base with Pipe 38mm x 4mm Thickness
Manufactured from both solid bar and tube, in mild steel and hi-tensile steel, Jack base & U-head are widely used in various scaffolding systems for adjusting working height.
Galvanized or Hot-dip galvanized finishing. Customized size is available as per request.
Jack Head 38mm x 600mm x 4mm
For bearing timber beams or steel beams. Slope of up to 6 % can be compensated by the head plate.
With height adjustment of 300 mm.
Scaffold Base Jack:
Screw /Tube size (mm) | Base plate (mm) | Nut (kg) | Weight (kg) |
Ø30(solid) x 400 (600) | 120 x 120 x 5 | 0.25 | 2.75 (3.72) |
Ø32(solid) x 400 (600) | 120 x 120 x 5 | 0.30 | 3.10 (4.20) |
Ø34(solid) x 400 (600) | 120 x 120 x 5 | 0.40 | 3.50 (4.76) |
Ø34(hollow) x 4 x 400 (600) | 150 x 150 x 6 | 0.55 | 2.80 (3.39) |
Ø38(hollow) x 4 x 400 (600) | 150 x 150 x 6 | 0.50 | 2.90 (3.60) |
Ø48(hollow) x 4 (5) x 600 | 150 x 150 x 8 | 1.00 | 5.00 (5.60) |
Ø48(hollow) x 4 (5) x 820 | 150 x 150 x 8 | 1.00 | 6.00 (6.80) |
U-head Jack:
Screw / Tube size (mm) | Base plate (mm) | Nut (kg) | Weight (kg) |
Ø30(solid) x 400 (600) | 150 x 120 x 50 x 5 | 0.25 | 3.36 (4.33) |
Ø32(solid) x 400 (600) | 150 x 120 x 50 x 5 | 0.30 | 3.70 (4.81) |
Ø34(solid) x 400 (600) | 150 x 120 x 50 x 5 | 0.40 | 4.10 (5.37) |
Ø34(hollow) x 4 x 400 (600) | 150 x 120 x 50 x 6 | 0.55 | 2.91 (3.74) |
Ø38(hollow) x 4 x 400 (600) | 150 x 150 x 50 x 6 | 0.50 | 3.61 (4.28) |
Ø48(hollow) x 4 (5) x 600 | 180 x 150 x 50 x 8 | 1.00 | 6.24 (6.82) |
Ø48(hollow) x 4 (5) x 820 | 180 x 150 x 50 x 8 | 1.00 | 7.20 (8.00) |
Packing:
1. Generally, the total net weight of loaded container is 22 tons
to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days
after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for
years, supplying: Formwork systems, scaffolding systems and related
accessories, which are widely used in commercial, residential and
infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork,
flexible slab formwork, frame scaffolding system, ringlock
scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line,
and pre-packing, which ensures the reliable product quality as per
customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a
comprehensive and complete concrete formwork and scaffolding
solution to clients.
HORIZON FORMWORK, your reliable formwork partner!